About market data 

Browser
The 'market data withdrawal' module has been optimised for Microsoft Internet Explorer, and we therefore recommend that you use this for the withdrawal.

Exclusion of liability
Energinet.dk accepts no liability for any errors in the data basis.

Introduction to download of market data - please see the right-hand menu. 

Changes to the data basis
2011-11-01:
Due to data basis errors for "Primary production, MWh/h - DK-East", "Gross consumption, MWh/h - DK-East" and "Net consumption, MWh/h - DK-East", data have been reset from 27 September 2011 and forward. Correct data will be uploaded later.

2011-06-10:
Due to data basis errors for "Physical exchange on transmission lines, MWh/h - DK-West and Sweden", "Gross consumption, MWh/h - DK-West" and "Net consumption, MWh/h - DK-West", data have been reset from 11 May 2011 and forward. Correct data will be uploaded later.

2011-06-01:
Due to data basis errors for "Physical exchange on transmission lines, MWh/h - DK-East and Sweden", "Gross consumption, MWh/h - DK-East" and "Net consumption, MWh/h - DK-East", data have been reset from 11 May 2011 and forward. Correct data will be uploaded later.

2011-03-11
"Total congestion income on international connections, Currency Code per hour" for "DK-West and Sweden" for 1 March 2011 hour 19 shows an incorrect value (DKK 10,726,962.73 per hour), the correct value is DKK -10,455.51 per hour. The correct value will be uploaded later.

2010-10-13:
Due to data basis errors for "System imbalance - surplus of power, MWh/h" and "System imbalance - deficit of power, MWh/h" for East Denmark, data have been reset from 1 January 2009 and forward. Correct data will be uploaded later.

2010-05-07:
For the period 1 - 7 April 2010, data on "Utilised capacity DK-West to Germany" under "Annual and monthly auctions of transmission capacity across the West Danish-German border, MWh/h" is missing.

2009-11-06:
Missingdata for the period 14 - 30 September 2009 due to metering errors, have now been uploaded. See eventual the message below from 2009-10-07.
 

2009-10-07:
Due to metering errors on international exchange measuring of the transmission grid, the data basis for "physical exchange on the transmission interconnections, MWh/h", gross and net consumption under "Production and consumption, MWh/h" for Western Denmark have been reset for the period 14 - 30 September 2009 (both days included). Correct data will be uploaded when figures are re-fixed.
 

2009-09-30:
Due to data basis errors new values for the time series under "scheduled trade (intraday excluded) on the transmission interconnections, MWh/h" for the period 6 - 30 October 2008 (both days included) have been uploaded.

 

Publications

Questions

You are welcome to contact us if you have specific questions about this page. See contact particulars in the top-right corner.